Integrated Healthcare Facility

Integrated Healthcare Facility was awarded to Joint venture of M/s SCC Infrastructure and M/s P. R. Patel & Co. on 2024-12-16 at a stated ₹133.68 Crore. Record type OFFICIAL, taken from dicdl_ar25.pdf, page 22. No completion date is published for this contract, so it cannot be reported as on time or late.

Award value133.68INR crore
Award date2024-12-16ISO
Construction start2025-02-07ISO
Scheduled completionno datanot published in any source
1.0

The record

SCH-INT / CONTRACT RECORD / REV A / 2026-08-04
Every published field for the Integrated Healthcare Facility award. Source: DICDL annual report and the dataset field list
No.ItemFieldValue as recorded
01Work as described in the sourceIntegrated Healthcare Facility, Dholera - construction work. 200-bed multi-specialty hospital; plot area 9,668 sq m; built-up area 15,815 sq m.
02Specification200-bed multi-specialty hospital
03Awarded to, as printedJoint venture of M/s SCC Infrastructure and M/s P. R. Patel & Co.
04Award basisEPC
05Project management consultantM/s Hites
06Value as printed₹133.68 Crore
07Value unitINR crore
08Award date as printedDecember 16, 2024
09Completion periodnot published
10Tender reference numbernot published in any source opened
11Pre-bid estimated valuenot published in any source opened
12Status as recordedUnder construction; construction started February 7, 2025
13Status as at2025-03-31 (FY2024-25 annual report, signed 10.11.2025)
14Record typeOFFICIAL
15Source documentdicdl_ar25.pdf, page 22
16Plot area9,668 sq m
17Built up area15,815 sq m
Source: dicdl_ar25.pdf, page 22. Record type OFFICIAL. All rows last verified 2026-08-04 against the cited page.
2.0

What the source actually says

Quoted from the document, not paraphrased

The Integrated Healthcare Facility project construction work was awarded to the joint venture of M/s SCC Infrastructure and M/s P. R. Patel & Co. on an EPC basis. The award date was December 16, 2024, and the total project cost is ₹133.68 Crore. M/s Hites serves as the Project Management Consultant (PMC). The facility covers a plot area of 9,668 square meters and has a built-up area of 15,

Quoted from dicdl_ar25.pdf, page 22. Record type OFFICIAL. Retrieved 2026-08-04. The quotation is truncated exactly where the extraction truncated it and has not been tidied.

Value is stated as 'total project cost', not as a separately reported bid/award amount. Project Management Consultant: M/s Hites.

3.0

Delivery against declared dates

What can and cannot be measured here

The winner took 53 days from award to starting on site, measured by subtracting the award date from the construction start date, both of which the annual report prints. That is the only delivery measure this record supports. Because no completion date exists on the record, the work cannot be described as running late or running early by anyone, including DICDL.

Across the register, six of eleven awards carry both an award date and a construction start date, and none of the seventeen records carries a completion date. The comparison view for all of them is on the delivery schedule.

The same firm holds 1 other award in this register: Food Court. Its full sheet is at SCC Infrastructure.

SHEET INT
REV A
DATE 2026-08-04
SOURCE dicdl_ar25.pdf
4.0

Declared gaps on this record

What is missing, stated plainly

  • GAP 01No tender reference number is published against this award in any source opened, so it cannot be joined to a tender notice.
  • GAP 02No pre-bid estimated contract value is published, so the bid against estimate variance cannot be computed.
  • GAP 03No contract duration and no scheduled completion date are published, so this contract cannot be shown as early, on time or late.

These gaps are taken from the dataset’s own declared gap list, filtered to the fields that are null on this record. They are not inferred. The complete list of seventeen contract gaps and eleven financial gaps is on the method sheet.

SHEETINT
REVISIONA
DATE ISSUED2026-08-04
STATUSUNDER CONSTRUCTION
TITLEIntegrated Healthcare Facility
SOURCEdicdl_ar25.pdf
AWARDED TOJoint venture of M/s SCC Infrastructure
RECORD TYPEOFFICIAL