Dholera Works Record
CONTRACTS 11 / OPEN TENDERS 6 / AUDITED FACTS 225 / UPDATED 2026-08-04 / REV A
SHEET FRM-SCCREV ASECTION 02 CONTRACTORS2026-08-04

SCC Infrastructure

SCC Infrastructure holds 2 awards in the Dholera register: Integrated Healthcare Facility, awarded 2024-12-16. Its disclosed work is worth Rs. 151.15 crore across 2 priced awards. Record type OFFICIAL, verified 2026-08-04.

1.0

Awards held

SCH-FRM-SCC / FIRM RECORD / REV A / 2026-08-04
Every Dholera award held by SCC Infrastructure. Source: DICDL annual report and the contract dataset
No.ItemWorkBasisAward valueINR croreAward dateISOConstruction startISOStateRecord
01Integrated Healthcare FacilityEPC133.682024-12-162025-02-07UNDER CONSTRUCTIONOFFICIAL
02Food CourtEPC17.472025-05-072025-06-04UNDER CONSTRUCTIONOFFICIAL
Source: dicdl_ar25.pdf. All rows last verified 2026-08-04 against the cited page.

Named in the sources as

  • Joint venture of M/s SCC Infrastructure and M/s P. R. Patel & Co.
  • M/s. SCC Infrastructure

Firms are grouped under one normalised name so that awards can be counted per firm. The printed variants above are the exact strings the sources use, kept so a reader can find the row in the original document.

2.0

What the documents say about this firm

Quoted, not summarised

The Integrated Healthcare Facility project construction work was awarded to the joint venture of M/s SCC Infrastructure and M/s P. R. Patel & Co. on an EPC basis. The award date was December 16, 2024, and the total project cost is ₹133.68 Crore. M/s Hites serves as the Project Management Consultant (PMC). The facility covers a plot area of 9,668 square meters and has a built-up area of 15,

On Integrated Healthcare Facility, quoted from dicdl_ar25.pdf, page 22. Record type OFFICIAL.

The Food Court project construction work was awarded to M/s. SCC Infrastructure on an EPC basis. The award date was May 7, 2025, and the total project cost is ₹17.47 Crore. M/s TPF Engineering Pvt Ltd. serves as the Project Management Consultant (PMC). The project aims to improve the region's livability. It covers a total land area of 7,466.84 square meters and has a bu

On Food Court, quoted from dicdl_ar25.pdf, page 23. Record type OFFICIAL.

3.0

Delivery record

What this firm's dates support

Mobilisation, DERIVED as construction start minus award date: Integrated Healthcare Facility 53 days, Food Court 28 days. No completion date is published against any of this firm's Dholera work, so nothing here can be described as late.

The whole register's delivery view, including the empty due date column that applies to every firm equally, is on the delivery schedule. The complete list of firms is on the contractors sheet.

SHEET FRM-SCC
REV A
DATE 2026-08-04
SOURCE dicdl_ar25.pdf
SHEETFRM-SCC
REVISIONA
DATE ISSUED2026-08-04
STATUSUNDER CONSTRUCTION
TITLESCC Infrastructure
SOURCEdicdl_ar25.pdf
AWARDS HELD2
DISCLOSED VALUE151.15 crore