Dholera Contracts
11 awards with a named winner / 6 tenders still open / Updated 2026-08-04

Which companies won government work at Dholera, and for how much

Tent City

This is a job DICDL is paying a contractor to build. Tent City was awarded to M/s Kamnath Private Limited on 2025-03-27 at a stated ₹1.55 Crore (management fees receivable BY DICDL). The record is marked OFFICIAL, which means it comes from a signed, audited annual report. No completion date is published for this contract anywhere, so nobody can say whether it is running on time or late. Everything on this page is taken from dicdl_ar25.pdf, page 27.

Award valueno datanot published
Award date2025-03-27ISO
Construction start2025-05-27ISO
Scheduled completionno datanot published in any source
01

Every published field on this award

Every published field for the Tent City award. Source: DICDL annual report and the dataset field list

Every published field for the Tent City award. Source: DICDL annual report and the dataset field list
No.ItemFieldValue as recorded
01Work as described in the sourceTent City, Dholera - eco-luxury retreat, construction plus 10-year operations period.
02Specificationeco-luxury retreat
03Awarded to, as printedM/s Kamnath Private Limited
04Award basisPPP (Public Private Partnership), 10-year operations period
05Value as printed₹1.55 Crore (management fees receivable BY DICDL)
06Value unitINR crore
07Award date as printedMarch 27, 2025
08Completion period10-year operations period (operations term, not a construction completion period)
09Tender reference numbernot published in any source opened
10Pre-bid estimated valuenot published in any source opened
11Status as recordedUnder construction; construction started May 27, 2025
12Status as at2025-03-31 (FY2024-25 annual report, signed 10.11.2025)
13Record typeOFFICIAL
14Source documentdicdl_ar25.pdf, page 27

Source: dicdl_ar25.pdf, page 27. Record type OFFICIAL. All rows last verified 2026-08-04 against the cited page.

02

What the document actually says

Quoted from the document, not paraphrased

The Tent City project construction work was awarded to M/s Kamnath Private Limited on a PPP (Public Private Partnership) basis with 10-year operations period. The award date was March 27, 2025, with management fees of ₹1.55 Crore receivable by DICDL. The project aims to create an eco-luxury retreat for business and leisure travellers. The Construction work of the proje

Quoted from dicdl_ar25.pdf, page 27. Record type OFFICIAL. Retrieved 2026-08-04. The quotation is truncated exactly where the extraction truncated it and has not been tidied.

awarded_value is deliberately null. The only figure in the source is ₹1.55 Crore of management fees RECEIVABLE BY DICDL under the PPP structure - money flowing IN to DICDL, not a contract price paid out. Recording it as an award value would misstate the direction of the payment. No construction contract value is disclosed.

03

How long the winner took to start

What can and cannot be measured here

The winner took 61 days from award to starting on site, measured by subtracting the award date from the construction start date, both of which the annual report prints. That is the only delivery measure this record supports. Because no completion date exists on the record, the work cannot be described as running late or running early by anyone, including DICDL.

Across the register, six of eleven awards carry both an award date and a construction start date, and none of the seventeen records carries a completion date. The comparison view for all of them is on the delivery schedule.

This is the only award held by Kamnath Private Limited in this register. Its sheet is at Kamnath Private Limited.

Source dicdl_ar25.pdf
Checked 2026-08-04
04

What is missing from this record

What is missing, stated plainly

  • GAP 01No tender reference number is published against this award in any source opened, so it cannot be joined to a tender notice.
  • GAP 02No pre-bid estimated contract value is published, so the bid against estimate variance cannot be computed.
  • GAP 03No award value is published. Nothing has been back solved from any other figure in the report.

These gaps are taken from the dataset’s own declared gap list, filtered to the fields that are null on this record. They are not inferred. The complete list of seventeen contract gaps and eleven financial gaps is on the method sheet.

PUBLISHED2026-08-11
VERSIONC
HOW SOLID IS THISUNDER CONSTRUCTION
WHAT THIS PAGE ISTent City
WHERE THE FIGURES COME FROMdicdl_ar25.pdf
AWARDED TOM/s Kamnath Private Limited
RECORD TYPEOFFICIAL