ABCD Building was awarded to M/s. Cube Construction Engineering Limited (CCEL) on a date no source publishes at a stated 72,31,11,111/-. Record type OFFICIAL, taken from dicdl_ar25.pdf, page 100. No completion date is published for this contract, so it cannot be reported as on time or late.
The record
| No.Item | Field | Value as recorded |
|---|---|---|
| 01 | Work as described in the source | Design and Construction of Administration and Business Centre of Dholera (ABCD) Building, DSIR, Dholera. |
| 02 | Awarded to, as printed | M/s. Cube Construction Engineering Limited (CCEL) |
| 03 | Award basis | EPC |
| 04 | Value as printed | 72,31,11,111/- |
| 05 | Value unit | INR crore (exact conversion of the printed rupee figure 72,31,11,111; 1 crore = 10,000,000) |
| 06 | Award date as printed | not stated |
| 07 | Completion period | not published |
| 08 | Tender reference number | not published in any source opened |
| 09 | Pre-bid estimated value | not published in any source opened |
| 10 | Status as recorded | Contractor has raised five claims against DICDL (build-up area excess, steel difference/escalation, extra foundation cost, outstanding maintenance bills, bank guarantee extension charges); disclosed under contingent liabilities. |
| 11 | Status as at | 2025-03-31 (FY2024-25 annual report notes) |
| 12 | Record type | OFFICIAL |
| 13 | Source document | dicdl_ar25.pdf, page 100 |
| Source: dicdl_ar25.pdf, page 100. Record type OFFICIAL. All rows last verified 2026-08-04 against the cited page. | ||
What the source actually says
Quoted from the document, not paraphrased
B. The Company had awarded contract for Design and Construction of Administration and Business Centre of Dholera (ABCD) Building in DSIR, Dholera on EPC Basis to M/s. Cube Construction Engineering Limited (CCEL) with contract amount of 72,31,11,111/-. CCEL has raised following claims: Claim No. 01 :- Cost Incurred as Result to Build Up Area Being More Than Contract (Cost Amount: Rs. 20,16,11,451/-) Claim No. 02 :- Cos
Quoted from dicdl_ar25.pdf, page 100. Record type OFFICIAL. Retrieved 2026-08-04. The quotation is truncated exactly where the extraction truncated it and has not been tidied.
Exact contract amount printed in the notes to the financial statements as 72,31,11,111/-. Original figure retained in value_as_printed; the crore conversion is arithmetic only. Award date is NOT stated in the source - left null. Widely repeated web claims of a 2021 award date come from property-marketing sites and were not used.
Delivery against declared dates
What can and cannot be measured here
Mobilisation cannot be measured for this record because at least one of the two dates is missing from every source opened. The cell stays blank rather than carrying an estimate.
Across the register, six of eleven awards carry both an award date and a construction start date, and none of the seventeen records carries a completion date. The comparison view for all of them is on the delivery schedule.
This is the only award held by Cube Construction Engineering Limited in this register. Its sheet is at Cube Construction Engineering Limited.
Declared gaps on this record
What is missing, stated plainly
- GAP 01No tender reference number is published against this award in any source opened, so it cannot be joined to a tender notice.
- GAP 02No pre-bid estimated contract value is published, so the bid against estimate variance cannot be computed.
- GAP 03No contract duration and no scheduled completion date are published, so this contract cannot be shown as early, on time or late.
- GAP 04No construction start date is published for this record.
These gaps are taken from the dataset’s own declared gap list, filtered to the fields that are null on this record. They are not inferred. The complete list of seventeen contract gaps and eleven financial gaps is on the method sheet.