Water Treatment Plant was awarded to M/s. SPML Infra Limited (SPML) on a date no source publishes with no value disclosed. Record type OFFICIAL, taken from dicdl_ar25.pdf, page 100. No completion date is published for this contract, so it cannot be reported as on time or late.
The record
| No.Item | Field | Value as recorded |
|---|---|---|
| 01 | Work as described in the source | Design, Construction, Operation and Maintenance of Water Treatment Plant (WTP) in Dholera Special Investment Region. |
| 02 | Awarded to, as printed | M/s. SPML Infra Limited (SPML) |
| 03 | Award basis | not stated |
| 04 | Value as printed | no value printed |
| 05 | Value unit | not applicable |
| 06 | Award date as printed | not stated |
| 07 | Completion period | not published |
| 08 | Tender reference number | not published in any source opened |
| 09 | Pre-bid estimated value | not published in any source opened |
| 10 | Status as recorded | TERMINATED by DICDL on January 01, 2021 for non-fulfilment of contract terms. Performance BG of ₹675 Lakhs and mobilisation advance BG of ₹990 Lakhs encashed; retention money of ₹206.43 Lakhs forfeited. SPML has invoked arbitration claiming ₹7,752 Lakhs and filed a case before the Commercial Court, Ahmedabad; DICDL has filed a counter arbitration claim of 2,22,723.22 lakhs. Proceedings in progress. |
| 11 | Status as at | 2025-03-31 (FY2024-25 annual report notes) |
| 12 | Record type | OFFICIAL |
| 13 | Source document | dicdl_ar25.pdf, page 100 |
| Source: dicdl_ar25.pdf, page 100. Record type OFFICIAL. All rows last verified 2026-08-04 against the cited page. | ||
What the source actually says
Quoted from the document, not paraphrased
A. The Company had awarded contract for Design, Construction, Operation and Maintenance of Water Treatment Plant (WTP) in Dholera Special Investment Region to M/s. SPML Infra Limited (SPML). The contract was terminated by the Company on January 01, 2021 on account of non- fulfilment of terms and conditions of the contract. Following steps have been taken by the Company on termination of the contract: 1) The Company has encashed p
Quoted from dicdl_ar25.pdf, page 100. Record type OFFICIAL. Retrieved 2026-08-04. The quotation is truncated exactly where the extraction truncated it and has not been tidied.
No contract value is disclosed anywhere in either annual report for this award - awarded_value is null, not estimated from the bank guarantee amounts. The same note appears in AR_FY2023-24.pdf p.104, also without a contract value. This is the one Dholera award in the dataset that is terminated and in dispute.
Delivery against declared dates
What can and cannot be measured here
Mobilisation cannot be measured for this record because at least one of the two dates is missing from every source opened. The cell stays blank rather than carrying an estimate.
Across the register, six of eleven awards carry both an award date and a construction start date, and none of the seventeen records carries a completion date. The comparison view for all of them is on the delivery schedule.
This is the only award held by SPML Infra Limited in this register. Its sheet is at SPML Infra Limited.
Declared gaps on this record
What is missing, stated plainly
- GAP 01No tender reference number is published against this award in any source opened, so it cannot be joined to a tender notice.
- GAP 02No pre-bid estimated contract value is published, so the bid against estimate variance cannot be computed.
- GAP 03No contract duration and no scheduled completion date are published, so this contract cannot be shown as early, on time or late.
- GAP 04No award value is published. Nothing has been back solved from any other figure in the report.
- GAP 05No construction start date is published for this record.
These gaps are taken from the dataset’s own declared gap list, filtered to the fields that are null on this record. They are not inferred. The complete list of seventeen contract gaps and eleven financial gaps is on the method sheet.