Dholera Contracts
11 awards with a named winner / 6 tenders still open / Updated 2026-08-04

Which companies won government work at Dholera, and for how much

Service Area Building

This is a job DICDL is paying a contractor to build. Service Area Building was awarded to Nila Infrastructures Limited on a date no source publishes at a stated Rs. 46.21 Cr.. The record is marked REPORTED, which means it appears only in trade press and no government document confirms it. No completion date is published for this contract anywhere, so nobody can say whether it is running on time or late. Everything on this page is taken from https://cablecommunity.com/nila-infrastructures-wins-contract-for-dholera-industrial-city/.

Award value46.21INR crore
Award dateno datanot stated in any source
Construction startno datanot published
Scheduled completionno datanot published in any source
01

Every published field on this award

Every published field for the Service Area Building award. Source: DICDL annual report and the dataset field list

Every published field for the Service Area Building award. Source: DICDL annual report and the dataset field list
No.ItemFieldValue as recorded
01Work as described in the sourceDesign and construction of 'Service Area Building' in Dholera Special Investment Region.
02Awarded to, as printedNila Infrastructures Limited
03Award basisEPC
04Value as printedRs. 46.21 Cr.
05Value unitINR crore
06Award date as printedAnnounced September 15, 2019 (announcement date, not necessarily the award date)
07Completion period545 days
08Tender reference numbernot published in any source opened
09Pre-bid estimated valuenot published in any source opened
10Status as recordedReported as won/awarded in 2019. Current status not verified in any government document opened for this dataset.
11Status as at2019-09-15 (date of the report)
12Record typeREPORTED
13Source documenthttps://cablecommunity.com/nila-infrastructures-wins-contract-for-dholera-industrial-city/

Source: https://cablecommunity.com/nila-infrastructures-wins-contract-for-dholera-industrial-city/. Record type REPORTED. All rows last verified 2026-08-04 against the cited page.

02

What the document actually says

Quoted from the document, not paraphrased

Contract value 'Rs. 46.21 Cr.' from Dholera Industrial City Development Limited (DICDL) for 'design and construction of "Service Area Building"' on 'EPC basis', completion period 545 days, announced September 15, 2019.

Quoted from https://cablecommunity.com/nila-infrastructures-wins-contract-for-dholera-industrial-city/. Record type REPORTED. Retrieved 2026-08-04. The quotation is truncated exactly where the extraction truncated it and has not been tidied.

REPORTED, not official. This award appears in NO DICDL annual report or government document examined here. Two conflicts to be aware of before publishing: (1) the announcement date is given as 15 September 2019 by this source and as 13 September 2019 by a Business Standard summary; (2) this source claims the 'Service Area Building' is 'also referred to as' the ABCD Building, which contradicts DICDL's own annual report - the ABCD Building was awarded to M/s Cube Construction Engineering Limited for 72,31,11,111/-. Treat the two as separate contracts and treat this record as unconfirmed.

03

How long the winner took to start

What can and cannot be measured here

Mobilisation cannot be measured for this record because at least one of the two dates is missing from every source opened. The cell stays blank rather than carrying an estimate.

Across the register, six of eleven awards carry both an award date and a construction start date, and none of the seventeen records carries a completion date. The comparison view for all of them is on the delivery schedule.

This is the only award held by Nila Infrastructures Limited in this register. Its sheet is at Nila Infrastructures Limited.

Source https://cablecommunity.com/nila-infrastructu
Checked 2026-08-04
04

What is missing from this record

What is missing, stated plainly

  • GAP 01No tender reference number is published against this award in any source opened, so it cannot be joined to a tender notice.
  • GAP 02No pre-bid estimated contract value is published, so the bid against estimate variance cannot be computed.
  • GAP 03No construction start date is published for this record.
  • GAP 04This award appears in no DICDL annual report and in no government document opened for this dataset. Treat it as unconfirmed.

These gaps are taken from the dataset’s own declared gap list, filtered to the fields that are null on this record. They are not inferred. The complete list of seventeen contract gaps and eleven financial gaps is on the method sheet.

PUBLISHED2026-08-11
VERSIONC
HOW SOLID IS THISSTATUS NOT PUBLISHED
WHAT THIS PAGE ISService Area Building
WHERE THE FIGURES COME FROMhttps://cablecommunity.com/nila-infrastructures-wins
AWARDED TONila Infrastructures Limited
RECORD TYPEREPORTED