Dholera Contracts
11 awards with a named winner / 6 tenders still open / Updated 2026-08-04

Which companies won government work at Dholera, and for how much

Residential and Commercial Mixed-Use Development

This is a plot of land sold at auction rather than a job DICDL is paying for, so the rupee figure below is what the buyer says it will invest. Residential and Commercial Mixed-Use Development was awarded to M/s GAP Associates (referred to elsewhere in the report as GAP Group) on 2024-11-14 at a stated approximately ₹2,000 Crore (total investment by the awardee). The record is marked OFFICIAL, which means it comes from a signed, audited annual report. No completion date is published for this contract anywhere, so nobody can say whether it is running on time or late. Everything on this page is taken from dicdl_ar25.pdf, page 28.

Award valueno datanot published
Award date2024-11-14ISO
Construction startno datanot published
Scheduled completionno datanot published in any source
01

Every published field on this award

Every published field for the Residential and Commercial Mixed-Use Development award. Source: DICDL annual report and the dataset field list

Every published field for the Residential and Commercial Mixed-Use Development award. Source: DICDL annual report and the dataset field list
No.ItemFieldValue as recorded
01Work as described in the sourcePlot awarded through E-Auction for development of Residential & Commercial Mixed-Use Development project, Dholera Activation Area (1,000+ studio apartments, 2BHK apartments, club, banquet hall, 100-room hotel, co-working and retail).
02Specificationover 1,000 modern studio apartments with commercial spaces; 500+ studio apartments, 100-room hotel
03Awarded to, as printedM/s GAP Associates (referred to elsewhere in the report as GAP Group)
04Award basisPlot allotment through E-Auction; Letter of Award
05Value as printedapproximately ₹2,000 Crore (total investment by the awardee)
06Value unitINR crore
07Award date as printedNovember 14, 2024
08Completion periodnot published
09Tender reference numbernot published in any source opened
10Pre-bid estimated valuenot published in any source opened
11Status as recordedConstruction started as per the provisions of the contract agreement; currently underway
12Status as at2025-03-31 (FY2024-25 annual report, signed 10.11.2025)
13Record typeOFFICIAL
14Source documentdicdl_ar25.pdf, page 28

Source: dicdl_ar25.pdf, page 28. Record type OFFICIAL. All rows last verified 2026-08-04 against the cited page.

02

What the document actually says

Quoted from the document, not paraphrased

M/s GAP Associates was awarded a plot through E-Auction for the development of Residential & Commercial Mixed-Use Development project. The Letter of Award was issued on November 14, 2024, and involves a total investment of approximately ₹ 2,000 Crore. The Construction work of the project started as per the provisions of the contract agreement, and it is currently underway.

Quoted from dicdl_ar25.pdf, page 28. Record type OFFICIAL. Retrieved 2026-08-04. The quotation is truncated exactly where the extraction truncated it and has not been tidied.

NOT a DICDL infrastructure works contract. This is a land award via e-auction; the ₹2,000 Crore is the awardee's own stated investment, is described as 'approximately', and is not money paid by DICDL. awarded_value is therefore null and the figure is kept only as printed text.

03

How long the winner took to start

What can and cannot be measured here

Mobilisation cannot be measured for this record because at least one of the two dates is missing from every source opened. The cell stays blank rather than carrying an estimate.

Across the register, six of eleven awards carry both an award date and a construction start date, and none of the seventeen records carries a completion date. The comparison view for all of them is on the delivery schedule.

This is the only award held by GAP Associates in this register. Its sheet is at GAP Associates.

Source dicdl_ar25.pdf
Checked 2026-08-04
04

What is missing from this record

What is missing, stated plainly

  • GAP 01No tender reference number is published against this award in any source opened, so it cannot be joined to a tender notice.
  • GAP 02No pre-bid estimated contract value is published, so the bid against estimate variance cannot be computed.
  • GAP 03No contract duration and no scheduled completion date are published, so this contract cannot be shown as early, on time or late.
  • GAP 04No award value is published. Nothing has been back solved from any other figure in the report.
  • GAP 05No construction start date is published for this record.

These gaps are taken from the dataset’s own declared gap list, filtered to the fields that are null on this record. They are not inferred. The complete list of seventeen contract gaps and eleven financial gaps is on the method sheet.

PUBLISHED2026-08-11
VERSIONC
HOW SOLID IS THISUNDER CONSTRUCTION
WHAT THIS PAGE ISResidential and Commercial Mixed-Use Development
WHERE THE FIGURES COME FROMdicdl_ar25.pdf
AWARDED TOM/s GAP Associates (referred to elsewhere in the report as GAP Group)
RECORD TYPEOFFICIAL