Accommodation Facilities for Investors was awarded to M/s Unique Builders on 2025-03-27 at a stated ₹26.72 Crore. Record type OFFICIAL, taken from dicdl_ar25.pdf, page 25. No completion date is published for this contract, so it cannot be reported as on time or late.
The record
| No.Item | Field | Value as recorded |
|---|---|---|
| 01 | Work as described in the source | Accommodation Facilities for Investors, Dholera Activation Area - construction work. Plot area 12,096.71 sq m; built-up area 4,000 sq m. |
| 02 | Awarded to, as printed | M/s Unique Builders |
| 03 | Award basis | EPC |
| 04 | Value as printed | ₹26.72 Crore |
| 05 | Project management consultant | M/s TPF Engineering Pvt Ltd. |
| 06 | Value unit | INR crore |
| 07 | Award date as printed | March 27, 2025 |
| 08 | Completion period | not published |
| 09 | Tender reference number | not published in any source opened |
| 10 | Pre-bid estimated value | not published in any source opened |
| 11 | Status as recorded | Under construction; construction started April 24, 2025 |
| 12 | Status as at | 2025-03-31 (FY2024-25 annual report, signed 10.11.2025) |
| 13 | Record type | OFFICIAL |
| 14 | Source document | dicdl_ar25.pdf, page 25 |
| 15 | Plot area | 12,096.71 sq m |
| 16 | Built up area | 4,000 sq m |
| Source: dicdl_ar25.pdf, page 25. Record type OFFICIAL. All rows last verified 2026-08-04 against the cited page. | ||
What the source actually says
Quoted from the document, not paraphrased
The Accommodation Facilities for Investors project construction work was awarded to M/s Unique Builders on an EPC basis. The award date was March 27, 2025, with a project cost of ₹26.72 Crore. M/s TPF Engineering Pvt Ltd. serves as the Project Management Consultant (PMC). The Accommodation Facilities for Investors covers a plot area of 12,096.71 Sq.Mt. with a built-up area of 4,000 Sq.Mt. The Cons
Quoted from dicdl_ar25.pdf, page 25. Record type OFFICIAL. Retrieved 2026-08-04. The quotation is truncated exactly where the extraction truncated it and has not been tidied.
Value is stated as 'project cost'. PMC: M/s TPF Engineering Pvt Ltd.
Delivery against declared dates
What can and cannot be measured here
The winner took 28 days from award to starting on site, measured by subtracting the award date from the construction start date, both of which the annual report prints. That is the only delivery measure this record supports. Because no completion date exists on the record, the work cannot be described as running late or running early by anyone, including DICDL.
Across the register, six of eleven awards carry both an award date and a construction start date, and none of the seventeen records carries a completion date. The comparison view for all of them is on the delivery schedule.
This is the only award held by Unique Builders in this register. Its sheet is at Unique Builders.
Declared gaps on this record
What is missing, stated plainly
- GAP 01No tender reference number is published against this award in any source opened, so it cannot be joined to a tender notice.
- GAP 02No pre-bid estimated contract value is published, so the bid against estimate variance cannot be computed.
- GAP 03No contract duration and no scheduled completion date are published, so this contract cannot be shown as early, on time or late.
These gaps are taken from the dataset’s own declared gap list, filtered to the fields that are null on this record. They are not inferred. The complete list of seventeen contract gaps and eleven financial gaps is on the method sheet.